Home Headlines DPWH completes infra project along Gumain-Porac Diversion Channel

DPWH completes infra project along Gumain-Porac Diversion Channel

507
0
SHARE

CITY OF SAN FERNANDO, Pampanga (PIA) — Department of Public Works and Highways (DPWH) completed an infrastructure project along the Gumain-Porac Diversion Channel (GPDC).

It was implemented by DPWH Pampanga 2nd District Engineering Office.

Department of Public Works and Highways completed the 100-linear meter rehabilitation of slope protection and concreting of the 600-linear meter section of the road dike along the Gumain-Porac Diversion Channel. (DPWH)

District Engineer Gregorio Audea Jr. disclosed that the project consists of 100-linear meter rehabilitation of slope protection and concreting of the 600-linear meter section of the road dike.

P29.39 million was earmarked for the project that was implemented in the San Pablo-Sta. Rita section of the diversion channel in Lubao.

“Not only will residents feel safer from flooding when areas near the GPDC experience heavy rainfall, but commuters and motorists will be able to travel more conveniently with its completion,” Audea said.

The road dike, which is an alternate road going to barangay Sta. Rita Lurang, is connected to the Lubao Bypass Road. (CLJD-PIA 3)

LEAVE A REPLY

Please enter your comment!
Please enter your name here